Industrial heavy load factory forklift use double face steel pallet two entry factory metal pallet
- Overview
- Inquiry
- Related Products
Specification
Product Name | Metal galvanized steel pallet |
Material | Galvanized steel Q235 |
Surface treatment | Galvanized / powder coating |
Entry Type | 2way / 4 way |
Face | Single face/deck, double face |
Dynamic Load | 1000KG |
Static Load | 3000KG |
Load of putting on racks | 1000KG |
Dimension (Width * Depth * Height) | EU pallet: 1200*1000*130 / 1200*800*130 |
American&Canada:48”(1219mm) * 40”(1016mm) * 5”(130mm) | |
Asia: 1100*1100*130mm | |
Australia: 1140*11140*130mm / 42”(1067mm)*42”(1067mm)*5''(130mm) | |
Handing equipment | Forklift, Hand lift |
Structure | Stick - Shielded Metal Arc Welding |
Other | All the size and load can be customized |
Product Description
Metal galvanized steel pallet is becoming more and more popular all around the world
Steel pallet is mainly used for ground storage, shelf storage, cargo transport and turnover, as container, stacking, handling and transportation of the place as a horizontal platform device unit load of goods and products, and is now an important warehousing and transportation industry auxiliary equipment one.
Advantages:
1. Welded construction
2. Eliminates need for wooden pallets
3. Heavy corrugated deck and stringers
4. Bacteria resistant
5. Easily cleanable
6. 100% recyclable and repairable
7. Contains holes for drainage
8. Large load capacity
9. Great for shipping
10. Available in standard colors and galvanized
Recommend Products
Company Profie
We are a racking system manufacturer with 20 years history, 50,000 square meters factory, more than 300 workers.
We are one of the top supplier in China, can make very nice quality, good price and fast delivery time.
Certifications
Customer Photos
FAQ
Q1. What is your terms of packing?exhibition
A: Generally, we pack our goods in carton boxs and plastic bubble film.
Q2. What is your terms of payment?
A: T/T 40% as deposit, and 60% before delivery. We'll show you the photos of the products and packages
before you pay the balance.
Q3. What is your terms of trade?
A: We can do EXW, FOB, CFR, CIF.
Q4. How about your delivery time?
A: Generally, it will take 15 to 25 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and
the courier cost.
Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery.
Q8: How do you make our business long term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.
Packing & Delivery
1. Once we finish producing your racks, we can ship them to you as soon as possible.
2. If you don’t have a Freight forwarder, we can help you to find one.